Controlled clearance work

Racking Dismantling
& Removals.

Controlled dismantling of redundant or relocated racking, planned around access, component handling and the condition in which the working area must be left.

05

25+ yearsPractical racking experience

SEIRS registeredTrained installation team

Reading basedNationwide UK service

Clear the space methodically, safely and on programme.

Whether racking is being relocated, retained for later use or cleared from a unit, the dismantling sequence matters. K&S agrees the scope, access and handling requirements before work starts, then completes the removal in an organised way.

A clear scope.
No loose ends.

01

Full dismantling

Controlled dismantling of complete racking runs and agreed associated components.

02

Partial removal

Remove selected bays or sections as part of a layout change or reduction.

03

Relocation preparation

Organise reusable components ready for an agreed move or later reinstallation.

04

End-of-project clearance

Leave the agreed working area tidy once the installation scope is complete.

Completed black cantilever racking installation for long materials
Dismantling capability

Controlled removal for changing warehouse spaces

View K&S project photography

Planned from the start.

Every scope is different, but the route through the work stays clear.

01

Define

We confirm what is being removed, what is being retained and the required completion condition.

02

Prepare

Access, sequencing, equipment, component handling and site requirements are planned.

03

Dismantle

The agreed system is taken down in a controlled and organised sequence.

04

Clear

Components are handled through the agreed route and the work area is left tidy.

Before work begins.

Useful answers for planning an enquiry. Project-specific details are confirmed as part of the quotation.

Can you dismantle only part of a racking installation?

Yes. Selected bays or runs can be included where the remaining layout and agreed scope allow.

Can components be retained for reuse?

Yes. Tell us before work begins which components are to be retained so handling and organisation can be planned accordingly.

Do you dismantle racking for relocations?

Yes. Dismantling can form the first stage of a planned racking relocation and reinstallation programme.

Can you work to an end-of-lease deadline?

K&S can plan work around an agreed programme, subject to the scale, access and availability requirements of the project.

What is needed for a quotation?

Photographs, approximate quantities, racking type, site address, access details, the intended destination of components and target dates are all helpful.

Tell us what the
site needs.

Send the location, required work, photographs or drawings and your preferred programme. We’ll review the information and discuss the right next step.

Request a quotation